30.07.2007
There will be given for use ring road in Sumgait.

In Sumgait there is constructing ring road that will be ready for use in September 2007. The two meters long road is intended for driving around of residential community along South-West city line. The road is planned to be laid from Mir Avenue that is located at the entrance of Sumgait city until Mohammed Asadov Street in Absheron district. The new road will be named in honour of Sumgait twin city Cherkassy.

16.08.2007
The project of mainline railroad «Baku – Tbilisi - Kars» (BTK) International bank of Azerbaijan transfer to an account of «Marabda – Kartzhahi Railway» LTD- the operator of Georgian sector of railway corridor Baku – Tbilisi – Kars- the first tranche amounting 40 million dollars from the credit given by Azerbaijan to Georgia. more »

10.08.2007
International port of Baku may be transferred to Alat settlement.
Ministry of Transportation of Azerbaijan Republic discuss the redeployment of International port of Baku to countryside with Korean company GS Engineering&Consruction. more »

30.07.2007
There will be given for use ring road in Sumgait.
In Sumgait there is constructing ring road that will be ready for use in September 2007. The two meters long road is intended for driving around of residential community along South-West city line. more »
Currency


Weather
 2005-2007 © Copyright, A-TRANS
 install flash player
      Bakililar.az Top Sites   Rambler's Top100